The structure ,block work and plastering is completed

  • Door installation is underway on the 4th floor
  • Gypsum work is underway on the 10th floor
  • The window seal is completed for all floors
  • The aluminum window is underway on the 7th floor
  • Door installation is underway on the 4th floor
  • Flooring is underway on the 7th floor