Currently the structure of the building is being done. The foundation, two basements floors, ground floor structure is completed and the first floor slab being constructed. Date: 30/10/2019
Currently the structure of the building is being done. The foundation, two basements floors, ground floor structure is completed and the first floor slab being constructed. Date: 30/10/2019